PRODUCTION FLOW
Multi tube production process
Pass Tube1 PAY OFF
Pass Tube2 PAY OFF
Wire PAY OFF
- 1.Straightener
- Process of copper tube inserted in straight line to extruder
- 2.Pre-heat
- Process of pre heating insulation for shooting process
- 3.Despenser
- Insulated copper tube and electrical wire dispensed together for next process
- 4.Molding
- Both copper tube and electrical wire inserted to CD tube
- 5.CD tube extrusion
- Copper tube and wire fixed and extruded inside the CD tube
- 6.Cutting
- Tubes cut to required length
- 7.Air brushing
- Removing foreign substance within the tubes
- 8.Winding
- Finished tubes winded in circle
- 9.Cutting
- Tubes cut to required length
- 10.Packing
- Coiled tube fixed with plastic bending
- 11.Delivery
- Finished product packed and delivered